GETAS International Building, 3rd floor
Monday - Friday 08:00-16:00
+251 911 503 447 / 50 55 38

    Project Detailsx

    Project Name & description
    Mixed use Building Support of Excavation
    Client: Mr. Nardelli Paolo Salo

    Type of work
    Shoring for B+G+10

    Contract Amount
    2,318,005.39

    Location
     Lebu Meberat Hail, Addis Ababa

     

    Project Overviewx

    In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.